Case Studies
Engineered Fluid System Cuts Plug and Abandonment Costs by 60%
A five-well HTHP plug-and-abandonment campaign required high-density brines and cement spacers. An engineered alternative to Sodium Bromide reduced total campaign costs by 60% and individual well costs by up to 90%.